- 4 tiers
- 2 40' container slots per tier
- 16 TEU per carriage
- 72 carriages are shown on each side of the administration building
- Each 72-carriage section will pass through a minimum of 1152 TEU every two days.
Day One - offloading, scanning, storing.
Day Two - Retrieval and Delivery using our in-house delivery system.
- Annual TEU throughput - 420,480
- Total acreage required for facility, including our in-house delivery system, will be approximately
25 acres.
|
MASSCOT INTERNET, INC
© Copyright 2001 - 2004 by Masscot Internet, Inc.
Cape Cod, Massachusetts - All rights reserved.
This page created and maintained by:
Masscot Internet,
West Yarmouth, (Cape Cod) MA 02673-8269 |
 |